Standard Detail
Section 6
Revision Date Redmond Standard Plan WSDOT Standard Plan
       
Concrete Inlet     06/01/06 B-25.60-00
Concrete Basin - Type 1  06/01/06 B-5.20-00 
Concrete Basin - Type 1L  06/01/06  B-5.40-00
Catch Basin - Type 2 06/01/06   B-10.20-00
Typ. Orientation of Type 2 Catch Basin in City Street 03/01/11 609A  
Typical Catch Basin Placement 03/01/11 609B  
Detention System Control Structure 03/01/12 610                              
Solid Metal Cover for Catch Basin  11/21/06   B-30.20-01
Miscellaneous Details for Drainage Structures  09/20/07   B-30.90-01
Manhole Type 3 06/01/06   B-15.60-00
Stormwater Valve  03/01/12 611  
Valve Box Extension 03/01/12 612  
Stormwater Manhole/Catch Basin Adjustment Detail  03/01/12 615  
Detention Vault Access Manhole Lid Over Low Point 03/01/12 616  
Alternate Vault Access 03/01/12 617  
Thru-Curb Inlet Frame Installation 03/01/11 618  
Combination Inlet  06/01/06   B-25.20-00
Rectangular Vaned Grate 06/01/06   B-30.30-00
Rectangular Herringbone Grate 06/01/06   B-30.50-00
Headwall & Rip Rap 03/01/11 620  
Lot Drain Trench 03/01/12 621  
Stenciling Detail 03/01/11 622  
Sidewalk Underdrain System 06/01/13 630  
Catch Basin Frame and Grate Replacement 03/01/12 631  
Rectangular Frame (Reversible) 06/08/06   B-30.10-00
Soil Amendment and Depth 03/01/11 632  
Permeable Pavement Section 03/01/12 643  
Pervious Concrete Sidewalk 03/01/12 646  
Permeable Pavement on Slopes 03/01/12 647  
Roof Rain Harvesting 03/01/12 650  


The links above include PDF pages. You may obtain the free Acrobat Reader to view and print.