Clearing, Grading & Temporary Erosion Control
Standard Detail
Section 5
Revision Date Redmond
Standard Plan
WSDOT Standard Plan
       
Filter Fabric Fence  07/01/07 502  
Stabilized Construction Entrance 09/01/95 503  
Paved Construction Exit 07/07/00 503A  
Temporary Swale 09/01/95 504  
Earth Dike 09/01/95 505  
Perimeter Dike/Swale 09/01/95 506
Storm Drain Inlet Protection 06/30/07   I-7
High Visibility Fence 08/11/09   I-15